Total time calculation on burndown graph is wrong for one user only

Greetings,

I'm stumped on this one. For one user only, the time shown on the top-left of the burndown graph is wildly different than the time shown on the Agile Board view or from adding all of the initial estimates from the Issues view.

I refresh the graph each time, so it isn't the classic "forgot to refresh issue". This is the
correct value from the Agile Board (2w1d4h1m):

CorrectTime.png


While this is the wrong value from the Burndown graph (4w4d4h1m):

WrongTime.png


I've tried to find anything different about Greg's configuration, swimlanes or tickets and have come up empty. Does anyone have insights on this, or should I file a bug report?

Thank you!
Frank