Gantt chart showing state spent time vs completed
Hello,
Currently the gantt chart shows 100% completion when est and spent time matches. However my team sometimes complete the task sooner than est time.
If however, the est is to small and spent time is greater, the gantt chart beautifully shows the excess time in red colour. Is there a way to also show that task was completed sooner than the estimate?
Than you,
Lukas
Please sign in to leave a comment.
Hello Lukas,
Gantt chart shows the underestimated time for a task in red and white. The overestimated time is shown in green and white, while the tasks completed right in time are shown in solid green. This is the default behaviour of Gantt chart, so no additional configuration is required.
Let me know if I missed something.